HVAC
- Engineering (Heat Load Calculation, Design & Equipment Selection)
- Procurement as per the approved material list
- Installation of equipment’s, connected pipelines
- Supply and Installation of chiller plants, cooling towers, chilled water pumps, FAU, AHU, FCU related pipeline work.
- Refrigeration and low temperature application projects. All types of duct work (GI, Pre-Insulated, Phenolic)
- Testing and commissioning.
- Air balancing and chiller water balancing.
- Equipment’s such as CHW Pumps, AHU’s Cooling Tower, Heat Exchanger etc.
- Kitchen hood and exhaust system.
- Operation and maintenance.